top of page

Roof Replacement

Completed for our customers in Cyncoed.


• Old tired leaky tiled roof removed back to the rafters.

• Existing insulation removed from the void

• New 18m osb3 plywood.

• New 1000 gauge polyurethane vapour control layer sealed with butyl tape.

• New 150mm iko elutherm insulation.

• New Spm with alpha profiles.

• New black grain fascia and deep flow gutters


Completed on time with no delays for our clients.



bottom of page