Completed for our customers in Cyncoed.
• Old tired leaky tiled roof removed back to the rafters.
• Existing insulation removed from the void
• New 18m osb3 plywood.
• New 1000 gauge polyurethane vapour control layer sealed with butyl tape.
• New 150mm iko elutherm insulation.
• New Spm with alpha profiles.
• New black grain fascia and deep flow gutters
Completed on time with no delays for our clients.